| 1. | The dynamic performance of a ram air system will vary with mach number and altitude and this tends to follow the aerodynamic characteristics of the missile . 像导弹空气动力特性一样,冲压空气式系统的动态特性随马赫数和高度的变化而变化。 |
| 2. | Air system control rooms distributed in each floor 3 .空调机房分布商场各楼层 |
| 3. | Clamp connecting conduit and accessories for air system 空气系统导管与附件连接卡箍 |
| 4. | 7200rt for air system , contains with bittern system 空调7200rt ,内含卤水系统 |
| 5. | Shihlin electric yang - de building s air system construction 士林电机仰德大楼空调工程 |
| 6. | Specification for clamp connecting conduit in air system 空气导管连接快卸卡箍通用规范 |
| 7. | Design and verification of compressed air system for agent 压缩空气净化系统的设计探讨 |
| 8. | Nuclear safety criteria for control air systems 控制空气系统的核安全准则 |
| 9. | Nksp first term air system construction 南港软件科学园区第一期空调工程 |
| 10. | Cec dun - nan building air system construction 大陆工程敦南大楼空调工程 |